Changes between Version 10 and Version 11 of WikiPages_Public/Digisonde to Final Review
- Timestamp:
- 28 Sep 2020 14:35:53 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
WikiPages_Public/Digisonde to Final Review
v10 v11 81 81 || Zama Katamzi-Joseph (ZK) || SANSA || 82 82 || Haris Haralambous (HH) || FU || 83 || Joanna Rupiewicz (JR) 83 || Joanna Rupiewicz (JR) || ESSP || 84 84 85 85 == Minutes == … … 124 124 __WP5 Assessment of the impact on aerospace and ground systems__ 125 125 126 [ MJ gave an overview talk on the objectives and the methodology adopted to perform the work done in WP5. This general part was followed by a specific presentation on the impact on NRT systems (presented by MJ), on the impact on EGNOS (presented by SM) and on the impact on HF systems (presented by JT).] 126 MJ gave an overview talk on the objectives and the methodology adopted to perform the work done in WP5. This general part was followed by a specific presentation on the impact on NRT systems (presented by MJ), on the impact on EGNOS (presented by SM) and on the impact on HF systems (presented by JT). 127 127 128 VP asked about the reliability of the impact assessment and the possibility to issue false alarms. MJ explained that the reliability of the impact assessment relies on the network configuration and on the software used by the service provider and the user.128 VP asked about the possibility to issue false alarms. JT explained that in this analysis TID periods without significant deviations of azimuth values have been identified, thus we could call these situations false negatives. 129 129 130 130 __WP6 Mitigation Technologies__