Changes between Version 10 and Version 11 of WikiPages_Public/Digisonde to Final Review


Ignore:
Timestamp:
28 Sep 2020 14:35:53 (4 years ago)
Author:
abelehaki
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WikiPages_Public/Digisonde to Final Review

    v10 v11  
    8181|| Zama Katamzi-Joseph   (ZK) || SANSA ||
    8282|| Haris Haralambous   (HH) || FU ||
    83 || Joanna Rupiewicz (JR)  || ESSP ||
     83|| Joanna Rupiewicz (JR) || ESSP ||
    8484
    8585== Minutes ==
     
    124124__WP5 Assessment of the impact on aerospace and ground systems__
    125125
    126 [ MJ gave an overview talk on the objectives and the methodology adopted to perform the work done in WP5. This general part was followed by a specific presentation on the impact on NRT systems (presented by MJ), on the impact on EGNOS (presented by SM) and on the impact on HF systems (presented by JT).]
     126MJ gave an overview talk on the objectives and the methodology adopted to perform the work done in WP5. This general part was followed by a specific presentation on the impact on NRT systems (presented by MJ), on the impact on EGNOS (presented by SM) and on the impact on HF systems (presented by JT).
    127127
    128 VP asked about the reliability of the impact assessment and the possibility to issue false alarms. MJ explained that the reliability of the impact assessment relies on the network configuration and on the software used by the service provider and the user.
     128VP asked about the possibility to issue false alarms. JT explained that in this analysis TID periods without significant deviations of azimuth values have been identified, thus we could call these situations false negatives. 
    129129
    130130__WP6 Mitigation Technologies__