Changes between Version 4 and Version 5 of WikiPages_Public/Digisonde to Final Review


Ignore:
Timestamp:
27 Sep 2020 20:10:37 (4 years ago)
Author:
abelehaki
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WikiPages_Public/Digisonde to Final Review

    v4 v5  
    6060|| 1645 - 1700 || Report to project members || Expert + PO ||
    6161|| 1700 || End of the meeting || ||
     62
     63==  
     64
     65
     66== Participants ==
     67
     68|| Name || Affiliation ||
     69|| Andrej Rozkov   (AR) || EC (Project Officer) ||
     70|| Viviane   Pierrard (VP) || BISA   (Expert Reviewer) ||
     71|| Anna Belehaki (ΑΒ) || ΝΟΑ ||
     72|| Claudia Borries (CB) || DLR ||
     73|| David Altadill (DA) || OE ||
     74|| Dalia Buresova (DB) || IAP ||
     75|| Ioanna   Tsagouri (IT) || NOA ||
     76|| Themistocles   Herekakis (TH) || NOA ||
     77|| Estefania   Blanch (EB) || OE ||
     78|| Miguel Juan (MJ) || UPC ||
     79|| Sergio Magdaleno (SM) || ESSP ||
     80|| Jens Toelle   (JT) || GFP ||
     81|| Stefan Unger   (SU) || GFP ||
     82|| Jens Mielich   (JM) || L-IAP ||
     83|| Tobias   Verhulst (TV) || RMI ||
     84|| Jurgen Watermann (JW) || JFW ||
     85|| Zama Katamzi-Joseph   (ZK) || SANSA ||
     86|| Haris Haralambous   (HH) || FU ||
     87
     88 
     89
     90 ==
     91== Minutes ==
     92__Introduction__
     93
     94The meeting started with brief introductory remarks by the expert evaluator Dr Viviane Pierrard: Significant progress has been demonstrated during the second reporting period. All the deliverables, which are numerous, have been submitted on time. During the meeting, the evaluator expressed the wish to receive clarification on the web site functionalities, on possibilities to provide the users with a quick view the general activity conditions, and on the plan for securing the sustainability of the web site.
     95
     96AR commented that the sustainability is an important aspect because based on the Consortium Agreement signed by all parties, the TechTIDE partners have to disseminate the project results for 4 years after the end of the EU funding period, and REA will follow up.
     97
     98__Overview of the project, progress achieved (Deliverables and Milestone status)__
     99
     100AB presented an overview of the progress achieved and the status of deliverables and milestones. AR had no comment. He was in particular pleased with the clear exploitation plan.
     101
     102VP commented the valuable approach to exploit the results of many different methods. She requested some additional information about the plans to secure funding for the operation of the warning system in the post EU project period. AB explained that the plan is to seek national funding, and some additional support from systematic users such as the European Space Agency who already expressed the interest to integrate parts of the TechTIDE services to the SSA Space Weather Portal. In addition, the consortium is active in the submission of new research proposal to the EC and to other agencies.
     103
     104VP asked some additional information on the definition of the activity levels. AB explained that the activity levels have been calculated for each methodology based on the statistical analysis of results accumulated in the TechTIDE database since 2017 and their comparison to performance degradation data obtained by EGNOS, NRTK and HF systems. More results will be presented in the WP2 and WP5 presentations. At this point VP asked if there is a list of events with high TID activity. AB explained that such a list is developed for WP3 analysis and as more data are accumulated in the database, the consortium is planning to compile a list of events with high TID activity.
     105
     106__WP1 Requirements analysis__
     107
     108CB gave an overview talk on the work done in WP1 that had the objective to collect users’ requirements and to feed the warning system specifications with new requirements in order to have at the end a system compliant with the users’ needs.
     109
     110VB asked if there was an evolution in the users’ classification. CB clarified that the users’ groups have been identified since the early stages of the project, i.e. EGNOS, NRTK, HD communications, HF geolocation, radio astronomers. However, within the course of the project different representatives from these groups have been approached and several of them attended the TechTIDE users’ workshops.
     111
     112__WP2 TID identification methodologies__
     113
     114DA gave an overview talk on the work done in WP2, explaining how the methodologies have been improved and validated.
     115
     116VP asked for additional clarifications about the reliability of each methodology. DA explained how the results from the different methodologies are crossed checked and confirmed considering also the TID drivers. AB explained that the ‘Activity report” page in the warning system provides in a consistent way the results from all basic methodologies in a way that it is straightforward for the user to quickly check the overall conditions. VP agreed that this page provides a good overview and she proposed to the consortium to consider to provide the Activity Report in the Home Page, in a future development.
     117
     118__WP3 TID activity metrics__
     119
     120DB gave an overview talk on the work done in WP3, explaining how the drivers are specified, how the ionospheric background conditions are calculated and how the interhemispheric conditions are assessed. Finally, she explained how the activity levels are defined.
     121
     122VP asked additional clarification about the geophysical conditions that lead to interhemispheric circulation of TIDs and about possible thresholds of the drivers (and especially of the Dst index) in order to observe TID activity. DB provided additional details based on the numerous events analyzed for the WP3 developments.
     123
     124__WP4 Warning system__
     125
     126AB gave an overview talk on the work done in WP4, explaining the various phases of the warning system development, focusing on the architecture and functionality of the final release.
     127
     128VP asked what are the most downloaded products. AB replied that the downloads are monitored by the internal services and within the last 6 months the data show that the AATR and TEC gradients are the most downloaded indicators, whereas the perturbation of the electron density in respect to median conditions is a product with many downloads. More results from the system log files will be presented in WP8 (Project Management).
     129
     130__WP5 Assessment of the impact on aerospace and ground systems__
     131
     132[ MJ gave an overview talk on the objectives and the methodology adopted
     133to perform the work done in WP5. This general part was followed by a specific
     134presentation on the impact on NRT systems (presented by MJ), on the impact on EGNOS
     135(presented by SM) and on the impact on HF systems (presented by JT).]
     136
     137VP asked about the reliability of the impact assessment and the possibility to issue false alarms. MJ explained that the reliability of the impact assessment relies on the network configuration and on the software used by the service provider and the user.
     138
     139__WP6 Mitigation Technologies__
     140
     141SM gave an overview talk on the objectives and the methodology adopted to perform the work done in WP6. This general part was followed by a specific presentation on the mitigation technologies developed for NRT systems (presented by MJ), for EGNOS (presented by SM) and for HF systems (presented by JT).
     142
     143VP asked if the same mitigation techniques can be applied in other applications and if the strategy can be improved. SM explained that the mitigation methodology is ready, but some adjustments per application might be necessary.
     144
     145__WP7 Dissemination, exploitation and communication activities__
     146
     147CB gave an overview talk on the work done in WP7, for the dissemination of the project results to the academic and research domain, for the communication with stakeholders and the general public and for the exploitation of the project results towards the sustainability.
     148
     149VP and AR found that the whole set of activities are in line with the EC principles and it is successfully implemented. VP recommended to add links to other EC projects in the same domain, in order to increase visibility.
     150
     151__Project Management, Risks, Advisory Board feedback, KPIs __
     152
     153AB presented how the project was managed, what were the contacts with the Advisory Board, what feedback was received, how the Key Performance Indicators were measured and what are the follow up plans.
     154
     155AR proposed to have the tables on the KPI included in the progress report that will be uploaded in the EC web site, because they summarize in an excellent way the work done and the successful outcome of the project. AR also asked the coordinator to double check in Sigma if all the publications listed concern the TechTIDE project and add any new entries that are missing.
     156
     157__Financial Reporting __
     158
     159AB presented a preliminary information on the personnel costs charged by the partners for the whole project and per WP. She also presented preliminary information about the other direct costs. She explained that the final data are under processing by the financial departments of the participants and will be submitted within the next days. However because of the COVID-19 work restrictions, there may be a delay in the submission of the final report. AR agreed to allow a delay of 2 weeks, beyond the official deadline for the submission of the final report.
     160
     161Several members of the consortium has cancelled tickets for their travel to Athens planned in April but cancelled because of the COVID-19 pandemic. AR advised those partners to claim the cancelled tickets explaining the actions taken to get a refund.
     162
     163AR clarified that in this phase of the project there is no possibility to shift money from partner to partner.
     164
     165__Report to project members__
     166
     167AR gave his concluding remarks: TechTIDE is an example of a successful project. All the objectives are achieved. The results are clear. The dissemination and exploitation activities are impressive. The risks were considered very carefully during the course of the project and have been anticipated. It was his pleasure to follow this project and to work with the consortium and with the coordinator.
     168
     169VP gave her concluding remarks: the work in TechTIDE was very professional. All the deliverables, which were numerous, were submitted on time. The project produced good science and new ideas emerged for new projects. The warning system is a useful tool for the users. The communication towards the public was good. There is a promising plan for the exploitation of the project results, including the maintenance of the web sites. The possibilities for commercialization through the ESA SSA give good prospects for the sustainability of the project.
     170
     171